Hebel vs EPS cladding explained

Hebel is a brand of autoclaved aerated concrete (AAC). EPS means expanded polystyrene, a foam material. Both can form part of a rendered wall system, but their properties and permitted uses differ. Choose a tested system for your specific building, not simply the lightest panel.

Illustrative AAC panels on a townhouse facade with scaffolding
Illustrative image, not a completed BMH project.

01

What AAC is

AAC is aerated concrete, commonly supplied as reinforced panels. It gives a more solid wall feel than foam. AAC itself is non-combustible, but a wall’s fire resistance, acoustic performance and thermal performance depend on the complete specified assembly, panel thickness and installation. A brand name alone does not establish compliance.

02

What EPS is

EPS foam is very lightweight and provides insulation. It can be shaped for some architectural details and is typically reinforced and coated as a complete system. EPS is combustible: adding render does not make the underlying foam non-combustible. It is not suitable for every building or location.

03

Fire safety comes before appearance

Building class, wall position, boundary setbacks, bushfire requirements and current Victorian rules can affect what is allowed. Ask your designer or building surveyor to confirm the proposed system before ordering. Do not replace a specified AAC system with EPS just because both can look similar after rendering.

04

Neither is just a panel

Fixings, battens, flashings, joints, mesh, base coats and top coats must be compatible with the manufacturer’s system. Keep movement joints in the locations specified. Poor detailing around windows and penetrations can let water in regardless of panel choice.

05

Questions for your quote

Ask for the manufacturer and system name, panel thickness, required coatings, access requirements and any exclusions. Compare the installed, finished wall rather than the panel price alone. We can discuss the finish; the project’s approvals determine the compliant wall system.

General guidance only. Site conditions, the specified product system and building approvals determine the right approach.